Use of the grid

Abbreviated form of legal sources

● TDR 4.0

Priority to renewable energy

Priority to renewable energy

Curtailment

The grid operator is obligated to take in all electricity from RES during each trading period (section T 16.7.2.1 TDR 3.0). Nevertheless, for reasons of grid safety and reliability, the grid operator may unlimitedly reduce RES imports at any time (section T 16.7.1.2 TDR 4.0).