The study assessed the optimal generation sizing to reach 60%, 80% and 95% renewables penetration by 2040. Two different climate years (2015 and 2016) have been assessed in a dispatch...

The study assessed the optimal generation sizing to reach 60%, 80% and 95% renewables penetration by 2040. Two different climate years (2015 and 2016) have been assessed in a dispatch...

The Balearic Islands, specifically Mallorca, Menorca, and Ibiza, are participating in the Clean Energy for EU Islands' 30 Renewable Energy Islands for 2030 initiative. The technical assistance for the Balearic...

The main focus of this report is on mapping the planning and further implementation of the advanced electricity metering infrastructure on the BES islands, which is the basis for the...

This report provides an overview of the legal framework for spatial and environmental planning in Denmark and examines the opportunities for developing wind turbines in selected sites on Venø. The...

This report explores the potential for integrating PV systems and BESS at Pantelleria Airport. Developing a hybrid PV-BESS plant at Pantelleria Airport represents a pivotal step toward achieving energy independence...
This report provides an in-depth assessment of wind energy development potential in Öland. It analyzes existing wind energy plans, technological advancements, land use constraints, and wind resource availability to identify...

This study explores the integration of renewable energy sources, including photovoltaics (PV), wind turbines (WT) and battery energy storage systems (BESS), to improve sustainability, reduce diesel dependency, and optimise costs...

This report presents the results of the pre-feasibility assessment for repowering the Nasca Wind Farm, located on San Pietro Island (Sardinia, Italy). To assess the repowering of the existing wind...

This report is a technological study of the decarbonisation of transport to satisfy the mobility needs of local stakeholders in Saaremaa and Ruhnu. The scope of the study covers road...

In 2021 and 2022 the Clean energy for EU islands secretariat (the secretariat) conducted a study on the regulatory barriers affecting the clean energy transition of islands. This provided significant...

The Municipality of Halki and the Energy Community of Halki have been selected for the second round of technical assistance under the Electryone project, provided by the Clean Energy for...

This Technical Assistance aims to support the electrification of A Illa de Arousa's port and mussel farming activities. The wind potential and solar potential of the island were analysed, indicating...

The island Ceantar na nOileán applied for technical assistance under the Clean Energy Transition for Ceantar na nOileán project. The Island Clean Energy Transition Agenda, developed by the local community...

This strategy sets out Öland’s vision for becoming a climate-resilient and environmentally sustainable island. It identifies key environmental challenges and outlines goals in areas such as renewable energy, biodiversity protection...

This report outlines technical assistance provided to Menorca to help the island meet its sustainability and decarbonization goals. It evaluates the island’s current energy system, identifies barriers to renewable energy...

This report outlines technical assistance provided to the island of Chios to support its shift toward a sustainable energy system. It includes an assessment of the island’s current energy profile...

This report delivers technical assistance for the “Gamechanger” award on Cres and Lošinj, aiming to accelerate their clean energy transition. It assesses the islands’ current energy systems and identifies opportunities...

Thira applied with the project Energy Upgrades in the Port Infrastructure of Thira for the second call for technical assistance from the Clean energy for EU islands secretariat in April...

Samos is a Greek island located in the eastern Aegean Sea, south of Chios, north of Patmos, and the Dodecanese, and off the coast of western Turkey, from which it...

Syros municipality has been proactive in preparation of mandatory Electric Vehicle Charging Plan in coordination with distribution system operator, HEDNO. The plan has been adopted and it foresees thirty four...